Plan ID:
Plan Name:
Total Blast
Total Volume
Avg PF
Avg Deviasi
| No. | Date | ID | Remark | Before | Depth | After | Area | Volume GPS | B(M) | S(M) | Plan Hole |
|---|
| ID Blast | Tanggal | Pit | Seam | Elevasi | RL | B | S | Depth Blaster | Act Depth | Wet Hole | 3m | 4m | 5m | 6m | 7m | 8m | 9m | 10m | Area | Volume | Blaster | GL Blast | GL Drilling | AN | ANFO | PF Plan | PF Opr | PF Act | PF Should | Detonator | >=3Row | Reason | Siang/Sore | Reason | PC1250 200 | PC1250 300 | PC2000 200 | PC2000 300 | Jarak Evakuasi | PF<0.22 | Lubang Berair | Arah IP | Tidak Ada Spoil | Material Gantung | Validasi GL | Steaming | Total Lubang Agregat | Status |
|---|